It was an intervention with repositioning and functional restoration of n. 2 spherical railway bearings, one unidirectional and one multidirectional and restoration activities of n. 2 fixed spherical bearings.
The intervention was carried out in three main phases starting with the installation of the service castles and related lifting equipment. After making the lifting jacks safe, we started the restoration activities of both the deteriorated parts and the anticorrosive protection.
For all the bearings object of the intervention, the height was carried out with quick-hardening self-leveling pourable mortar to ensure smooth operation after unloading the lifting system.
The intervention was performed according to the time schedule with an excellent final result.